CPS
project management
Australia wide service
In 2015 we started to manufacture core structures of buildings as prefabricated insulated timber elements in a factory.
The system is originally from Switzerland and with the help of a very good engineer in Newcastle who translated the system into the Australian standards so we could start manufacturing in 2015.
The system reduces the building time of a project by approximate 60%.
Enquire
041 325 91 66